FAQs

Stanley Contracting

  • How long does a roof replacement take?

    Typically, residential roof replacements are completed within one to two days. The exact duration can vary based on factors such as the size of the roof, weather conditions, and the specific materials being used.
  • How long does a bathroom remodel take?

    A standard bathroom remodel project generally requires approximately two to three weeks to complete.
  • How long does a kitchen remodel take?

    Kitchen remodeling projects usually take between three to four weeks to finish, depending on the scope of work involved.